Civil construction worker (night works / block of line)Rules- Regulatory designation
- Rail: rail personnel covered by the access provider's safety case (Railways Act 2005 s 30(1)(k)); roads: None specific - general duty (HSWA 2015 s 36; fatigue named in s 16 'hazard')
- Hours and rest
- No statutory maximum; ERA 2000 ss 69ZD-69ZE rest and meal breaks
| Critical risk | Working beside live traffic or inside rail possessions overnight; plant movements in the dark; setting out and lifting traffic management at 04:00-06:00 | Night shifts (often 22:00-06:00) bolted onto day weeks, weekend possessions, rapid day/night switches, long travel to site |
|---|
Crane operatorRules- Regulatory designation
- None specific - general duty; WorkSafe Approved Code of Practice for Cranes
- Hours and rest
- No statutory maximum; ERA 2000 ss 69ZD-69ZE rest and meal breaks
| Critical risk | Blind lifts on radio, heavy and tandem lifts, night lifts on infrastructure projects, long hours alone in the cab; driving the mobile crane to site | Early starts (06:00 or earlier), 10-12 h days in the cab with few breaks, night lifts, weekend work |
|---|
Tipper / truck-and-trailer driver / concrete truck driverRules- Regulatory designation
- Driver of a work-time vehicle (Land Transport Rule: Work Time and Logbooks 2007)
- Hours and rest
- Work Time Rule: 30 min break after 5.5 h; max 13 h work per cumulative work day; 10 h continuous rest; 70 h then 24 h off
| Critical risk | Early-start tipper runs to quarries and tip sites, concrete agitator deliveries to pours, low-loader plant floats; reversing on congested sites | Starts at 04:00-05:00, 12 h+ days, load-rate pay, queuing at quarries |
|---|
Plant operatorRules- Regulatory designation
- None specific - general duty (HSWA 2015 s 36; fatigue named in s 16 'hazard')
- Hours and rest
- No statutory maximum; ERA 2000 ss 69ZD-69ZE rest and meal breaks
| High risk | Excavator lifting and trenching near buried services, roller and dozer work on batters, reversing near spotters; night paving and profiling runs | Long summer days, early starts, travel to remote projects, seasonal night paving |
|---|
Concrete placer / pump operator / formworkerRules- Regulatory designation
- None specific - general duty (HSWA 2015 s 36; fatigue named in s 16 'hazard')
- Hours and rest
- No statutory maximum; ERA 2000 ss 69ZD-69ZE rest and meal breaks
| High risk | Continuous slab and bridge-deck pours running through the night, concrete pump and boom operation, finishing; formwork stripping at height | Pours starting before 04:00 to beat heat and traffic, 14-18 h continuous pours, early starts all week |
|---|
Scaffolder / steel erectorRules- Regulatory designation
- Certificate of competence for scaffolding over 5 m (WorkSafe scaffolding registration)
- Hours and rest
- No statutory maximum; ERA 2000 ss 69ZD-69ZE rest and meal breaks
| High risk | Erecting and dismantling scaffold and structural steel at height, connecting beams, edge work, manual handling of heavy components | Early starts, long days in heat, physically demanding work, piece-rate or schedule pressure |
|---|
Temporary traffic management (TTM) workerRules- Regulatory designation
- TTM-qualified worker under the NZ Guide to Temporary Traffic Management
- Hours and rest
- No statutory maximum; ERA 2000 ss 69ZD-69ZE rest and meal breaks
| High risk | Stop-slow bat or portable signals beside live traffic, lane closures on high-speed roads at night, long static vigilance with no stand-down | Night shifts and early starts, 10-12 h days standing, monotony with intermittent high threat, travel between sites |
|---|