Night works operative (road works / rail engineering hours)Rules- Regulatory designation
- None specific - general duty (WSHA 2006 s 12); LTA permit-to-work for rail corridor works
- Hours and rest
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| Critical risk | Working beside live traffic or inside rail possessions overnight; plant movements in the dark; setting out and lifting traffic management at 04:00-06:00 | Work packed into the short overnight engineering window (about 01:00-04:30) on rail, and night road closures |
|---|
Crane operator (tower / lorry crane)Rules- Regulatory designation
- Registered crane operator (WSH (Operation of Cranes) Regulations 2011)
- Hours and rest
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| Critical risk | Blind lifts on radio, heavy and tandem lifts, night lifts on infrastructure projects, long hours alone in the cab; driving the mobile crane to site | Early starts (06:00 or earlier), 10-12 h days in the cab with few breaks, night lifts, weekend work |
|---|
Tipper lorry driver / concrete mixer driverRules- Regulatory designation
- None specific - no driving-hours statute (MOT reply 12 Sep 2022); general duty (WSHA s 12)
- Hours and rest
- Employment Act Part IV only (covered bands); MOM worker-lorry rule: 30 min rest after 6 h site work for dual-role drivers
| Critical risk | Tipper runs and concrete mixer deliveries; carrying workers on lorry decks between dormitory and site (vehicle buddy rule) | Starts at 04:00-05:00, 12 h+ days, load-rate pay, queuing at quarries |
|---|
Excavator / plant operatorRules- Regulatory designation
- None specific - general duty (WSHA 2006 s 12)
- Hours and rest
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| High risk | Excavator lifting and trenching near buried services, roller and dozer work on batters, reversing near spotters; night paving and profiling runs | Long summer days, early starts, travel to remote projects, seasonal night paving |
|---|
Concreting worker / formwork workerRules- Regulatory designation
- None specific - general duty (WSHA 2006 s 12)
- Hours and rest
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| High risk | Continuous slab and bridge-deck pours running through the night, concrete pump and boom operation, finishing; formwork stripping at height | Pours starting before 04:00 to beat heat and traffic, 14-18 h continuous pours, early starts all week |
|---|
Scaffold erector / steel erectorRules- Regulatory designation
- Scaffold erector with approved course (WSH (Scaffolds) Regs 2011)
- Hours and rest
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| High risk | Erecting and dismantling scaffold and structural steel at height, connecting beams, edge work, manual handling of heavy components | Early starts, long days in heat, physically demanding work, piece-rate or schedule pressure |
|---|
Traffic marshal / flagmanRules- Regulatory designation
- None specific - general duty (WSHA 2006 s 12); LTA Code of Practice for traffic control at work zones
- Hours and rest
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| High risk | Stop-slow bat or portable signals beside live traffic, lane closures on high-speed roads at night, long static vigilance with no stand-down | Night shifts and early starts, 10-12 h days standing, monotony with intermittent high threat, travel between sites |
|---|