Dump truck driver (quarry) / underground haul truck driverRules- Regulatory designation
- Night worker (OWTA 1997 s 16) - health assessment, GA Regs 2007 reg 157; Mines Regs S.I. 133/2018 and Quarries Regs 2025 (no fatigue provision)
- Hours and rest
- OWTA 1997: 48 h avg (no opt-out), 11 h daily rest; night worker avg 8 h in 24 (s 16)
| High risk | Driving a 200-300 t haul truck through the 02:00-06:00 window; ramp descents, dumping at crest/edge, intersections with light vehicles; monotony between loads | Quarries mostly day work with early starts; the underground zinc mine runs rotating shifts |
|---|
Underground loader (LHD) operatorRules- Regulatory designation
- Night worker (OWTA 1997 s 16) - health assessment, GA Regs 2007 reg 157; Mines Regs S.I. 133/2018
- Hours and rest
- OWTA 1997: 48 h avg (no opt-out), 11 h daily rest; night worker avg 8 h in 24 (s 16)
| High risk | Operating loaders (LHD/bogger), continuous miners or shuttle cars in confined headings; tele-remote bogging at the stope brow; vehicle-pedestrian interaction in low light | 12 h rotating day/night underground with no daylight cues, heat, FIFO swings, long travel in and out of the decline |
|---|
ShotfirerRules- Regulatory designation
- Competent shotfirer (Quarries Regs 2025 / Mines Regs 2018; explosives licensing); night worker (OWTA 1997 s 16) - health assessment, GA Regs 2007 reg 157
- Hours and rest
- OWTA 1997: 48 h avg (no opt-out), 11 h daily rest; night worker avg 8 h in 24 (s 16)
| High risk | Charging and tying-in blast holes, misfire handling, clearing and guarding the blast area, firing near shift change; re-entry decisions after the blast | Blasting at shift change or end of night shift, time pressure to fire on schedule, 12 h rotations |
|---|
Shift supervisor / competent inspectorRules- Regulatory designation
- Competent person (Mines Regs 2018); night worker (OWTA 1997 s 16) - health assessment, GA Regs 2007 reg 157
- Hours and rest
- OWTA 1997: 48 h avg (no opt-out), 11 h daily rest; night worker avg 8 h in 24 (s 16)
| High risk | Pre-shift and in-shift inspection for gas, ground and ventilation; deciding whether crews may enter; gas testing and reporting at the end of a night shift | 12 h rotating shifts with inspections timed at the start of each shift, including the 04:00-06:00 low |
|---|
Maintenance fitter (mine/quarry)Rules- Regulatory designation
- Night worker (OWTA 1997 s 16) - health assessment, GA Regs 2007 reg 157; Mines Regs S.I. 133/2018
- Hours and rest
- OWTA 1997: 48 h avg (no opt-out), 11 h daily rest; night worker avg 8 h in 24 (s 16)
| High risk | Isolation and lock-out of HV and mobile plant, work under raised loads, haul truck tyre changes, conveyor repairs during night shutdowns | 12 h rotating shifts, night shutdowns and call-outs, overtime during planned shutdowns |
|---|