Risk & Safety · Fatiguefit and Sleepfit

Fatigue is a hazard. After an incident, you’ll be asked how you controlled it.

US law expects employers to keep the workplace free of recognized hazards, and fatigue can be one of them. Fatiguefit and Sleepfit give you the assessment, sleep-health indicators for safety-critical roles, the point-of-duty control, the training record and the investigation method, each producing evidence you can file.

The liability question

Hours rules are the floor, not the defense.

A compliant schedule can still put a fatigued crew to work: what predicts impairment is the sleep people actually got, not the hours on the roster.

Hours-of-service rules set limits in rail, aviation and trucking, and since 2022 the Federal Railroad Administration has required railroads covered by its safety program rules to include a fatigue risk management program. Beyond those rules, the OSH Act’s General Duty Clause requires employers to protect workers from recognized hazards, and fatigue can be one.

After a serious incident, investigators and plaintiffs ask the same question: what did you know about fatigue, and what did you do about it? In 2014 a federal accident investigation recorded the absence of sleep-disorder screening as a contributing cause of a fatal train crash.

Nothing we provide discharges that obligation. What each product does is produce evidence that an element of your fatigue risk management program was carried out, to a standard you can show.

Through the year

Fatigue risk has a season. Plan for it.

Season alone moves fatigue risk modestly. The sharper effects come from specific weeks and workloads: clocks springing forward, the hottest nights, harvest, peak trading and flu season. These are the dates that matter in the United States in 2027.

  1. 14 Mar · Measured

    Clocks spring forward

    Fatal crashes up about 6% the following week; mining injuries up 5.7% the next Monday

  2. Apr to May · Measured

    Planting

    First of two farm-injury peaks

  3. Jun to Aug · Measured

    Hottest nights, longest days

    Warm nights and long days shorten sleep

  4. Jul · Documented

    Prime Day

    Serious injuries up 48% week on week at one employer

  5. Jul to Sep · Documented

    Wildfire season

    Deployments cut sleep

  6. Sep to Oct · Measured

    Harvest

    Second, larger farm-injury peak

  7. 7 Nov · Measured

    Clocks go back

    No net change in crash risk; pedestrian risk rises in dark evenings

  8. Nov to Dec · Documented

    Peak trading season

    Overtime and new starters

  9. Dec to Feb · Documented

    Flu season

    Occupancy surge and overtime

Measured: a published study found a change in sleep, injuries or crashes. Documented: a recorded change in workload or exposure, such as overtime or deployments. Dates are for 2027 and move each year. Our reading of published evidence, refreshed every November.

Where we sit

Controls at the levels you can evidence.

  1. Level 1

    Sleep opportunity

    The roster does not allow enough time for adequate sleep. The failure is in the work pattern, before anyone has slept badly.

    How it is controlled

    Hours-of-service rules and roster design, supported by bio-mathematical modeling of work patterns.

    Where we sitFatiguefit*

    * Optionally, we work with a partner to review your rosters as part of the Fatiguefit risk assessment.

  2. Level 2

    Sleep obtained

    The opportunity to sleep existed, but the sleep did not follow: an undiagnosed disorder, psychological distress, life stage, environment or habit.

    How it is controlled

    Measuring the sleep actually obtained across a workforce, and acting on what it shows.

  3. Level 3

    Behavioral symptoms at work

    Fatigue is present in the shift and is showing in behavior, whether or not the person has recognized it.

    How it is controlled

    Structured assessment at role and task level: sleepiness scales, symptom checklists and trained observation.

  4. Level 4

    Fatigue-related errors

    Fatigue is present and has produced an error. The only question left is whether the system catches it before it reaches the operation.

    How it is controlled

    Fatigue-proofing: task design, cross-checking, error-tolerant procedures and timing critical work away from the circadian low.

    Where we sit

    Provided by othersFatigue-proofing is designed into equipment, tasks and procedures by others. We don’t supply it; we refer, and list the control types that apply to each industry. Control types by industry

  5. Level 5

    Fatigue-related incidents

    It has already happened. The value now is in what the organization learns from it.

    How it is controlled

    Structured investigation of whether fatigue contributed and through which pathway, feeding back into the levels above.

    Where we sitWas It Fatigue?

Framework: Dawson D & McCulloch K, "Managing fatigue: it's about sleep", Sleep Medicine Reviews, 2005. Level 4 fatigue-proofing after Dawson, Chapman & Thomas, 2012.

The products

Fatiguefit and Sleepfit

See what sleep and fatigue mean for your workforce.

Tell us your industry and roughly how many people you employ. Your snapshot models how many are likely sleeping poorly and what it costs you. Then tell us what you want to focus on, and we’ll show you how open access would work for you, and what it would cost.

A sample workforce snapshot on a tablet: modeled sleep problems and the cost of poor sleep for 1,400 people in transport and logistics.