Field technicianPeraturan- Penetapan peraturan
- None specific - general duty (WSHA 2006 s 12)
- Waktu kerja dan rehat
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| Risiko kritikal | After-hours fault restoration on copper, fibre and HFC, pole and pit work near power lines and traffic, driving to call-outs after a full day | On-call call-outs at night, extended days during outages and storms, solo work and long rural drives |
|---|
Data centre facilities technicianPeraturan- Penetapan peraturan
- Licensed Electrical Worker (Electricity Act 2001)
- Waktu kerja dan rehat
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| Risiko kritikal | Switching UPS, generator and HV/LV supplies during maintenance, battery room work, responding to cooling failures overnight, often alone | 24/7 rotating 12 h shifts, lone night cover at exchanges and data centres |
|---|
Rooftop telecoms technicianPeraturan- Penetapan peraturan
- None specific - general duty (WSHA 2006 s 12); WSH (Work at Heights) Regs 2013
- Waktu kerja dan rehat
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| Risiko tinggi | Climbing 30-100 m towers to install and maintain antennas, rigging loads, RF exposure management, rooftop work at night | Travelling crews with long drives between sites, compressed rollout schedules, weather windows, night maintenance windows |
|---|
NOC engineerPeraturan- Penetapan peraturan
- None specific - general duty (WSHA 2006 s 12)
- Waktu kerja dan rehat
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| Risiko tinggi | Monitoring the core network overnight, triaging alarms, rerouting traffic, restoring emergency call carriage during outages | 24/7 rotating 12 h shifts incl. nights, screen vigilance, incident surges |
|---|
Network engineerPeraturan- Penetapan peraturan
- None specific - general duty (WSHA 2006 s 12)
- Waktu kerja dan rehat
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| Risiko tinggi | Executing core routing, switching and software changes in 00:00-05:00 maintenance windows, rollback decisions, after a normal day of work | Night change windows added on top of day duties, weekly or more, with little recovery time |
|---|
Cable-laying crewPeraturan- Penetapan peraturan
- None specific - general duty (WSHA 2006 s 12)
- Waktu kerja dan rehat
- Employment Act Part IV (covered pay bands): 12 h/day cap, 72 OT h/month, weekly rest day
| Risiko tinggi | Trenching, directional drilling and pit installation near live services and traffic; aerial fibre on power poles; night works in city streets | Early starts and night works under traffic permits, production-rate pay, travel between sites |
|---|